







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateADU Services in Mather, CA
If you own a home in Mather and you’ve started pricing an accessory dwelling unit, you’ve probably already hit the first wall: nobody quite agrees on what’s allowed on your lot. That confusion is real, and it’s specific to this community. Mather is unincorporated Sacramento County, so your ADU answers come from the County, not the City of Sacramento, and a lot of contractors quoting work here don’t realize that until plans get kicked back. We do this full-time, and we handle the permits ourselves. Call (279) 321-4864 for a free estimate. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday.
Key Takeaways
- Mather ADUs are reviewed under Sacramento County’s ordinance, not a city code, which changes the paperwork and the review path.
- Our technicians have up to 11 years of experience, and ADUs are the only thing we build.
- We’re an authorized builder for Abodu, Cover, and Dvele, so prefab and custom both stay under one accountable roof.
- Design, permitting, and construction stay in-house from the first sketch to the final inspection.
Why Mather Homeowners Choose ADU Builder Citrus Heights

Most of the calls we get from Mather start the same way. Someone has a decent-sized backyard, a garage that’s mostly storage, and a parent or adult child who needs their own space. They’ve talked to two or three builders and heard three different versions of what the County will approve.
That gap is where we’re useful. We’re an authorized builder for Abodu, Cover, and Dvele, which means you get to compare factory-built precision against a fully custom build without switching companies halfway through. Your ADU, your choice. And because design, permitting, and construction all sit with us, there’s no hand-off where the designer blames the expediter and the builder blames the plans.
Our technicians have up to 11 years of experience, and every project we take on is ADU work. Not kitchen remodels with an ADU on the side. Detached units, garage conversions, junior ADUs, and additions tied to an ADU project, and that’s the list. If a crew tells you they handle ADUs and everything else, ask them how many County reviews they’ve sat through.
We work across Mather, from the original base-era streets near the old airfield through the newer infill pockets off Mather Boulevard and the quiet blocks toward the wildlife area. When you call, you get a straight answer about your lot, not a sales pitch about square footage.
ADU Services We Offer in Mather
Five service lines, all pointed at the same goal: a finished, permitted unit on your property. Here’s what each one covers.
Detached ADU Construction
A standalone unit in the backyard is the most flexible ADU option and the one most Mather lots can actually accommodate. We handle site planning, foundation, utilities, and the finished build, whether that’s a custom structure or a factory-built home from Abodu, Cover, or Dvele. Learn more about our ADU builders in Mather.

Garage Conversions
Turn your garage into rental income, or into a place for family, without breaking ground on a new foundation. Mather’s slab-on-grade garages with alley access convert cleanly, and the budget is usually a real step down from a ground-up build. Learn more about garage conversion in Mather.

Junior ADUs (JADUs)
A JADU fits inside your existing home’s footprint and shares your kitchen or baths, which makes it the lowest-cost entry point into adding livable space. It’s a good fit for the single-story base-era homes common in Mather. Learn more about our junior ADU in Mather.

Home Additions Tied to ADU Projects
Sometimes the right answer isn’t a separate building. A carefully planned addition can create a connected unit that shares walls, utilities, and rooflines with the main house. We only take these on when the addition is part of an ADU plan, which keeps our attention where it belongs.
ADU Design & Permits
We handle the permits, and we mean that literally: drawings, County submittal, responses to plan-check comments, and inspection coordination. Because we know this is a County review and not a city one, we don’t lose weeks figuring out which counter to visit. Learn more about ADU Builder Citrus Heights and how our design and permit work fits together.
Neighborhoods We Serve in Mather
Mather is small enough that we can cover the whole community without stretching. Most estimate visits land within a few days of your call.
- The original base-era streets near the former airfield, where single-story homes sit on generous lots
- Infill pockets along Mather Boulevard
- Blocks toward the Mather Wildlife Area, where rear lots open onto former airfield land
- The newer tract homes on the community’s edges
Why Mather’s Climate & Housing Affect ADU
Start with the heat. Sacramento Valley summers here regularly push past 100°F, and a small unit without real insulation, proper shading, and a correctly sized HVAC system becomes unusable by early afternoon. We treat efficiency as structural, not optional. Winter tule fog matters too, because it changes how you plan windows and ventilation for a unit someone lives in year-round.
Then there’s the ground. Mather’s clay soils hold water and move with the seasons, and the mature oak canopy across much of the community pulls moisture in ways a flat lot doesn’t. Foundation and drainage decisions get made early, and they aren’t the place to save money. Our technicians have up to 11 years of experience reading these conditions.
The housing stock pushes the design in a clear direction. Original 1950s and 1960s Mather AFB-era homes are single-story, slab-on-grade, with small rear yards and alley access. That layout favors detached backyard units and garage conversions far more than second-story additions. One more thing: original service lines and older electrical panels are common retrofit items on these homes, so we check them before plans are final.
Pricing for ADU in Mather

Nobody can quote an ADU from a phone call, and anyone who tries is guessing. What we can say is that a junior ADU inside the existing footprint is the lowest-cost path, a garage conversion is the next step up, and a detached unit is the largest investment of the three. Factory-built homes from Abodu, Cover, or Dvele can change the math on a detached unit, sometimes in your favor, sometimes not, depending on site work.
Every quote we give is written and line-item. The written estimate sets the final price, and we confirm the numbers with the County before anyone swings a hammer. Call (279) 321-4864 to schedule your free estimate.
Service Area – Cities Near Mather
Mather sits in the middle of a cluster of communities we work in regularly. If you’re just outside the community line, we can still help. We build in Gold River, Rancho Cordova, Carmichael, and Arden-Arcade, and the same County review questions come up across all of them.
Serving Mather, CA – Our Local Coverage Area
We serve Mather and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About ADU in Mather

Sacramento County reviews it, because Mather is unincorporated. That’s the single biggest difference between building here and building inside the City of Sacramento, and it’s why contractors who only work city jobs get surprised. We confirm the rules with the County’s planning and building department before your plans are final. Call (279) 321-4864 for a free estimate.
Usually yes, and more easily than in many neighboring communities. Mather’s base-era lots tend to be generous, and because this is a small community under County rules rather than city rules, a detached unit often gets permitted and placed without the lot-size and parking fights that come up in Sacramento or Rancho Cordova. The exact answer depends on your specific lot, so we check it before quoting.
It depends on which of the three paths you choose: a junior ADU inside the house, a garage conversion, or a detached unit. Garage conversions are the budget-friendlier route to livable square footage, and detached builds are the largest investment. We give written, line-item estimates so you can see where the money goes. Call (279) 321-4864 for an exact quote, and estimates are free.
No. The written estimate sets the final price. The place where projects actually go sideways is the unknown: an old electrical panel, a service line that needs replacing, soil conditions under a foundation. We look for those before the estimate is written, not after demolition. Call (279) 321-4864 to get started.
The schedule is set in your written estimate. Review timelines vary by project and by what the County asks for, so we don’t promise a fixed number of weeks up front. What we can promise is that design, permitting, and construction stay in-house, so nobody is waiting on a vendor who’s waiting on someone else. Call (279) 321-4864 for a free estimate.
Whether you’re eyeing the garage, sketching a backyard unit, or trying to figure out if a JADU fits your floor plan, the first step is the same. Call (279) 321-4864 to schedule your free estimate. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at ADU Builder Citrus Heights.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local ADU pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Mather Customers Say
"Garage conversion to a one bedroom unit. He handled the plans, the city submittal, and every round of corrections. Took six months from first meeting to final inspection and he never once made the permit process my problem."
- Miguel Castillo"Detached unit in the back yard. Utilities trenched, separate meter, and it passed final on the first inspection."
- Tim Hayes"Every invoice was tied to a completed milestone, so I always knew what I was paying for."
- Dana Schaefer











